Kanban - options for setting time limit on issues in list

I have a basic Kanban board. I am looking for options to set limits on how long an issue can be in a list.

For example. The Kanban board has a list called In Progress. I would like to limit how long the issue can be in the list. If the issue is in the list longer than the threshold, would like a visual indicator in the issue.
(this is similar to the Threshold limit in Agility)

any suggestions?