Giltab Schedules

Is it possible to differenciate Schedule jobs on time?
For exampe Pipeline has 2 jobs “on-schedule” and Gitlab Schedules has 1 scheduling for master branch.
If this job was triggered Gitlab will run 2 jobs.
I want to run 1 job 1 time per day , and another one 1 time per week and all jobs should are in master branch.