Multi-project downstream pipeline retry

Is there a way to trigger downstream pipeline on retry?

GIVEN: Im having multi-project with integration tests downstream project.
When the pipeline fail because of errors in downstream project (integration tests)
And I merge fix to the downstream project
And I retry downstream job

ACTUAL: Then Job is still failing
EXPECTED: Then Job is succeeded

How can i improve it to prevent restarting whole Multi-project pipeline but only downstream one?