Project timeout not respected by job

Hi,

A run which lasted 16h (usually lasts 5 minutes) was never stopped by the 1h timeout set in project settings. We do not have any minutes remaining because of that.

image

How can I make sure the project timeout is always respected by the jobs?
If this is really a bug from gitlab, is there anyway to have these minutes credited?

Thank you for your help.